6.9 KiB
Plugin Transition Execution Receipts Implementation Plan
For agentic workers: REQUIRED SUB-SKILL: Use superpowers:subagent-driven-development (recommended) or superpowers:executing-plans to implement this plan task-by-task. Steps use checkbox (
- [ ]) syntax for tracking.
Goal: Execute recorded Plugin transition plans through a pluggable target executor while persisting idempotent batch and step receipts with retry and compensation controls.
Architecture: Transition steps gain immutable compensation artifact identity. A payload resolver rehydrates trusted content from the installed release and verifies the recorded SHA-256 before dispatching to a configured executor SPI; the built-in executor is dry-run:v1 and performs no external writes. Execution batches and step receipts use a database-backed state machine independent from Plugin publication transactions.
Tech Stack: Java 8, Spring, MyBatis XML, Fastjson2, JUnit 4, Mockito, MySQL 5.7-compatible SQL, Vue 2, Element UI, Node test runner.
Global Constraints
- Default execution is
dry-run:v1; it must not connect to or modify a target database, permission service, or menu service. - Every step body is reloaded from the trusted installed release and must match the hash recorded in the immutable Transition Plan.
EXECUTEis idempotent after success;RETRYis allowed only after a failed forward attempt;COMPENSATEis allowed only after a successful forward attempt and runs reversible steps in reverse order.- Executor failures are persisted as
FAILEDreceipts and returned as data; validation and illegal state transitions fail before a new batch is created. - Existing publication and rollback transactions continue to create only the immutable Transition Journal; external execution is a separate explicit action.
- Existing plaintext development credentials and TLS verification settings remain out of scope by explicit user decision.
Task 1: Compensation Identity And Payload Resolution
Files:
-
Modify:
ruoyi-generator/src/main/java/com/ruoyi/generator/factory/plugin/model/PluginTransitionStep.java -
Modify:
ruoyi-generator/src/main/java/com/ruoyi/generator/factory/plugin/PluginTransitionPlanner.java -
Create:
ruoyi-generator/src/main/java/com/ruoyi/generator/factory/plugin/execution/ResolvedPluginContribution.java -
Create:
ruoyi-generator/src/main/java/com/ruoyi/generator/factory/plugin/execution/PluginContributionContentResolver.java -
Test:
ruoyi-generator/src/test/java/com/ruoyi/generator/factory/plugin/PluginTransitionPlannerTest.java -
Test:
ruoyi-generator/src/test/java/com/ruoyi/generator/factory/plugin/execution/PluginContributionContentResolverTest.java -
Write failing tests for apply/rollback compensation identity and trusted payload hash verification.
-
Implement compensation metadata, release payload lookup, direction-aware content resolution, and mismatch rejection.
-
Verify planner and resolver tests pass.
Task 2: Target Executor SPI
Files:
-
Create:
ruoyi-generator/src/main/java/com/ruoyi/generator/config/PluginExecutionProperties.java -
Create:
ruoyi-generator/src/main/java/com/ruoyi/generator/factory/plugin/execution/PluginContributionExecutionContext.java -
Create:
ruoyi-generator/src/main/java/com/ruoyi/generator/factory/plugin/execution/PluginContributionExecutionResult.java -
Create:
ruoyi-generator/src/main/java/com/ruoyi/generator/factory/plugin/execution/PluginContributionTargetExecutor.java -
Create:
ruoyi-generator/src/main/java/com/ruoyi/generator/factory/plugin/execution/PluginContributionExecutorRegistry.java -
Create:
ruoyi-generator/src/main/java/com/ruoyi/generator/factory/plugin/execution/DryRunPluginContributionTargetExecutor.java -
Test:
ruoyi-generator/src/test/java/com/ruoyi/generator/factory/plugin/execution/PluginContributionExecutorRegistryTest.java -
Write failing tests for configured executor selection, unsupported target rejection, and deterministic dry-run receipt identity.
-
Implement the SPI, configured registry lookup, and no-side-effect dry-run executor.
-
Verify executor tests pass.
Task 3: Execution Batch And Step Receipt State Machine
Files:
-
Create:
ruoyi-generator/src/main/java/com/ruoyi/generator/factory/plugin/model/PluginTransitionExecution.java -
Create:
ruoyi-generator/src/main/java/com/ruoyi/generator/factory/plugin/model/PluginTransitionStepReceipt.java -
Create:
ruoyi-generator/src/main/java/com/ruoyi/generator/mapper/factory/PluginTransitionExecutionMapper.java -
Create:
ruoyi-generator/src/main/resources/mapper/factory/PluginTransitionExecutionMapper.xml -
Create:
ruoyi-generator/src/main/java/com/ruoyi/generator/service/PluginTransitionExecutionService.java -
Modify:
ruoyi-generator/src/main/java/com/ruoyi/generator/factory/plugin/model/PluginTransitionRecord.java -
Modify:
ruoyi-generator/src/main/java/com/ruoyi/generator/mapper/factory/PluginRegistryMapper.java -
Modify:
ruoyi-generator/src/main/resources/mapper/factory/PluginRegistryMapper.xml -
Modify:
sql/factory_plugin_registry.sql -
Modify:
sql/front_workbench.sql -
Modify:
sql/db.sql -
Test:
ruoyi-generator/src/test/java/com/ruoyi/generator/service/PluginTransitionExecutionServiceTest.java -
Test:
ruoyi-generator/src/test/java/com/ruoyi/generator/factory/plugin/PluginRegistrySchemaScriptTest.java -
Write failing tests for successful execution, persisted failure, idempotent re-entry, retry guards, and reverse compensation order.
-
Add immutable execution/receipt tables and MyBatis mappings.
-
Implement transition fingerprint verification, locking, attempt numbering, state guards, step dispatch, and receipt persistence.
-
Verify service and schema tests pass.
Task 4: API And Admin UI
Files:
-
Modify:
ruoyi-generator/src/main/java/com/ruoyi/generator/controller/FeaturePluginController.java -
Modify:
ruoyi-ui/src/api/generator/plugin.js -
Modify:
ruoyi-ui/src/views/generator/plugin/index.vue -
Modify:
ruoyi-ui/test/pluginRegistryView.test.mjs -
Modify:
sql/plugin_registry_menu.sql -
Write failing controller/static UI contracts for execute, retry, compensate, status, and receipt inspection.
-
Add permission-protected APIs and menu permission.
-
Add execution status, explicit actions, and receipt dialog to the existing transition table.
-
Verify frontend contracts and production build pass.
Task 5: Documentation And Regression
Files:
-
Modify:
docs/superpowers/specs/2026-07-10-ai-software-factory-roadmap.md -
Create:
docs/superpowers/plans/2026-07-10-plugin-transition-execution-receipts.md -
Document D8e1 behavior and the dry-run boundary.
-
Run focused Plugin execution tests.
-
Run generator full regression and compare only against the documented 18 baseline failures.
-
Run admin critical tests, frontend static tests, and the production build.
-
Confirm local EasyCode and RuoYi UI development endpoints still respond.