# Diagram And Paper Phase 1 Implementation Plan > **For agentic workers:** REQUIRED SUB-SKILL: Use superpowers:executing-plans to implement this plan task-by-task. Steps use checkbox (`- [ ]`) syntax for tracking. **Goal:** Add first-phase diagram generation and AI paper draft tools to the EasyCode front workbench project detail flow. **Architecture:** Reuse the existing front project data model, DeepSeek-backed AI service, and AI task infrastructure. Add lightweight diagram and paper DTOs plus synchronous endpoints for MVP generation; expose them in `easycode-web` as project-level pages reachable from project detail cards. **Tech Stack:** Java 8, Spring Boot 2.5, Fastjson2, Vue 3, Vite, Element Plus, SVG/HTML export in browser. ## Global Constraints - Do not add automated tests because the user explicitly requested to test manually. - Do not create a new worktree because the current working tree contains uncommitted prerequisite platform changes. - Keep changes scoped to phase 1: ER/module/architecture/project diagrams, AI flow/use-case diagrams, paper outline, paper draft, and browser-side exports. - Reuse existing `/front/project` authentication and ownership checks. --- ### Task 1: Backend AI DTOs And Service Methods **Files:** - Modify: `ruoyi-generator/src/main/java/com/ruoyi/generator/service/front/IAiGenerateService.java` - Modify: `ruoyi-generator/src/main/java/com/ruoyi/generator/service/front/AiGenerateServiceImpl.java` - Create: `ruoyi-generator/src/main/java/com/ruoyi/generator/domain/front/dto/GenerateDiagramRequest.java` - Create: `ruoyi-generator/src/main/java/com/ruoyi/generator/domain/front/dto/DiagramDesignResponse.java` - Create: `ruoyi-generator/src/main/java/com/ruoyi/generator/domain/front/dto/GeneratePaperOutlineRequest.java` - Create: `ruoyi-generator/src/main/java/com/ruoyi/generator/domain/front/dto/PaperOutlineResponse.java` - Create: `ruoyi-generator/src/main/java/com/ruoyi/generator/domain/front/dto/GeneratePaperDraftRequest.java` - Create: `ruoyi-generator/src/main/java/com/ruoyi/generator/domain/front/dto/PaperDraftResponse.java` - [ ] Add DTOs with JavaBean getters/setters. - [ ] Add service interface methods for diagram, paper outline, and paper draft generation. - [ ] Implement project-context prompts and JSON/Markdown parsing in `AiGenerateServiceImpl`. ### Task 2: Backend Routes And Task Types **Files:** - Modify: `ruoyi-admin/src/main/java/com/ruoyi/web/controller/front/FrontProjectController.java` - Modify: `ruoyi-generator/src/main/java/com/ruoyi/generator/service/front/AiGenerationTaskServiceImpl.java` - Modify: `ruoyi-generator/src/main/java/com/ruoyi/generator/service/front/AiGenerationTaskWorker.java` - [ ] Add synchronous MVP endpoints under `/front/project/{projectId}`. - [ ] Permit async task types `diagram_spec`, `paper_outline`, and `paper_draft`. - [ ] Route async tasks to the new service methods for future long-running usage. ### Task 3: Frontend API And Routing **Files:** - Modify: `easycode-web/src/api/project.js` - Modify: `easycode-web/src/router/index.js` - Modify: `easycode-web/src/views/ProjectListView.vue` - Create: `easycode-web/src/views/DiagramCenterView.vue` - Create: `easycode-web/src/views/PaperDraftView.vue` - [ ] Add API calls for diagram, paper outline, and paper draft generation. - [ ] Add authenticated routes for diagram center and paper draft pages. - [ ] Add project card/detail actions that link to the new pages. ### Task 4: Diagram Center MVP **Files:** - Create: `easycode-web/src/views/DiagramCenterView.vue` - [ ] Load the selected project and database design. - [ ] Render ER, module, architecture, and project overview diagrams from saved project data. - [ ] Generate AI flow/use-case diagram specs and render them as simple editable text plus SVG preview. - [ ] Export SVG and PNG from the browser. ### Task 5: Paper Draft MVP **Files:** - Create: `easycode-web/src/views/PaperDraftView.vue` - [ ] Generate outline from project context. - [ ] Generate Markdown draft from confirmed outline. - [ ] Show editable draft preview. - [ ] Download Word-compatible `.doc` and Markdown from the browser. ### Task 6: Verification **Files:** - Existing project files only. - [ ] Run Java compile for touched backend modules if practical. - [ ] Run frontend production build if practical. - [ ] Report any skipped verification clearly.